Step Out Drilling Extends Main Zone at Depth and Intercepts 21.2 g/t Au over 1.7 metres at Barry Project

Metanor Resources Inc.

VAL-D'OR, QUEBEC--(Marketwired - Feb. 27, 2018) - Metanor Resources Inc. ("Metanor") (TSX VENTURE:MTO) is pleased to announce new high-grade results of 21.2 g/t Au over 1.7 metres, 31.5 g/t Au over 1.1 meters and 24.7 g/t Au over 1.5 metres at the Barry project. Metanor has also extended the main shear zone at depth with grades of 6.4 g/t Au over 5.1 metres and 3.9 g/t Au over 12.0 metres.