Metanor intersects 7.1 g/t Au over 8.2 metres in a shear zone at Barry
VAL-D'OR, QUEBEC--(Marketwired - Aug. 28, 2017) - Metanor Resources Inc. ("Metanor") (TSX VENTURE:MTO) is pleased to provide this update on its ongoing surface drilling program at the Barry project located in the Urban-Barry camp. Over the past three months, the focus has been on verifying the extension of several gold bearing shear zones identified below and located outside the Barry pit area. The current program has attained its main objective of outlining the high-grade gold bearing shear zones. Since the last press release issued June 8th, 2017, 21 holes have been drilled and assayed and they have all intersected multiple shears at various depth.