Atacama Pacific Provides Feasibility Study Update
TORONTO, ONTARIO--(Marketwired - Aug. 3, 2017) - Atacama Pacific Gold Corporation (TSX VENTURE:ATM) ("Atacama Pacific") announces that it has defined the Cerro Maricunga Oxide Gold Project development parameters that will be used during the upcoming feasibility study. While the basic tenets of the 2014 Cerro Maricunga Prefeasibility Study ("2014 PFS") remain unchanged, the updated parameters include the elimination of the second and tertiary crushers and the removal of the conveyor system with the identification of a new leach pad area located adjacent to the planned open pit.