About

IDM Mining is focused on exploring and developing high-grade, low capex precious metal projects in stable jurisdictions.  Our flagship Red Mountain Gold Project hosts a high-grade resource, amenable to bulk underground mining.

The Red Mountain Project is an advanced stage gold project located in north western British Columbia 18km east-southeast of Stewart, BC. Over $40 million in work has been completed on the property by previous operators and includes: 127,300 metres of surface and underground drilling, 2000 metres of underground development, and advanced environmental, metallurgical, and engineering studies.  A 43-101 compliant resource was completed on the project in 2013. At 3 g/t cut-off, the resource estimate consists of 1,138,000 tonnes averaging 8.7 g/t gold in a Measured Category, 473,000 Tonnes at 7.7 g/t gold in an Indicated category, and 807,000 tonnes at 5.4 g/t gold in an Inferred category*.

Events & Conferences