Golden Predator Intersects 39.6 m of 13.3 g/t Gold at the 3 Aces Project

Golden Predator Mining Corp.

VANCOUVER, BC--(Marketwired - May 30, 2017) - Golden Predator Mining Corp. (TSX VENTURE: GPY) (OTCQX: NTGSF) (the "Company" or "Golden Predator") is pleased to report assay results for 16 of 43 drill holes completed as of May 15, 2017 at the 3 Aces Project in southeastern Yukon, Canada. These drill holes are concentrated at the Spades Zone, and are designed to better define the structural controls of the gold mineralization and to expand the zones by stepping out laterally along strike. Results include the highest-grade drill intercept received to-date on the Ace of Spades vein, as well as high-grade intercepts from the Seven and Three of Spades veins. Step-out drilling has successfully encountered mineralization 150 m from previous Ace of Spades drill intercepts. These drill results are part of a fully funded 40,000 m drill program[1], which will continue throughout 2017.